AIM — Agile Infrastructure Management

Site Investigation.
Precision Delivered.

Trial pits, slit trenches, and service location surveys — proving clear corridor for EPC clients on infrastructure projects across the UK.

Explore
What We Deliver

Ground truth before a single pipe goes in.

Before any infrastructure project breaks ground, the corridor needs to be proven clear. AIM delivers comprehensive site investigation — trial pits, slit trenches, and service location surveys — with full 3D point cloud capture, detailed reporting, and fast turnaround. Our EPC clients get the certainty they need to programme works and manage risk from day one.


3D Point Cloud Capture

Every excavation, captured in full 3D.

Each trial pit is scanned and processed into an interactive 3D point cloud — giving the design team a permanent, measurable digital record of what was found below ground. Pan, zoom, and rotate to inspect the excavation from any angle.

Live 3D Model
Interactive — Pan & Rotate
Valleyfield CSO — Tp03 CW  |  Valleyfield WwTW, Dunfermline, Fife 23 April 2026

Trial Pit Report — Tp03 CW

The data behind the dig.

Every trial pit is logged with full dimensional data, ground conditions, GPS location, and a comprehensive photographic record. Below is the complete report from the Valleyfield CSO investigation.

Excavation Details

Project Valleyfield CSO
Trial Pit Ref Tp03 CW
Date 23 April 2026
Location Valleyfield WwTW, Dunfermline, Fife, KY12 8SR
Surface Type Carriageway
Logged By Cameron Gourdie, Team Leader
Report Standard GO2 Trial Pit Report Form

Dimensions

Length 2,350 mm
Width 650 mm
Depth 1,700 mm
Full Depth Achieved Yes
Excavation Volume ≈ 2.6 m³

Investigation Requirements

Water Required
Electricity / Power Required
Gas Required
Telecoms (TU) Required
Sewer Required
Structure / Foundation Required

Ground Conditions & Orientation

Soil Type Clay, Silt, Sand, Gravel, Boulders, Concrete
TP Sides Logged North, East, South, West
GPS Survey Completed
3D Capture Pix4D Point Cloud
Photo Record 5 pages (multi-angle)

Services Located

Ref Service Dia (mm) Material Colour Condition On PU Drawing? Dist. from A (mm) Dist. from D (mm) Depth (mm)
1 HV
2 Sewer / Culvert
Site Note: No services located within this trial pit. Corridor clear at this location.
* Pipes deeper than 1.5m bGL are assumed diameters — no access to services 1.5m+ bGL without Temporary Works requested.

Capability

Built for infrastructure programmes.

AIM's site investigation service is designed around what EPC contractors and utility clients actually need — reliable data, fast turnaround, and reporting that feeds straight into the design process.

Trial Pits & Slit Trenches

Machine and hand-dug excavations for service location, ground investigation, and corridor clearance verification on live infrastructure routes.

Service Location Surveys

Positive identification and recording of all underground services — utilities, drainage, telecoms — with depth, diameter, material, and condition logging.

3D Point Cloud Capture

Every excavation photographed and processed into an interactive 3D model — a permanent digital record the client can revisit at any stage of the project.

Detailed Reporting

Full trial pit reports with dimensioned plans, sections, photographic records, and GPS data — formatted to client or principal contractor standards.

Clear Corridor Proof

Delivering the evidence EPC clients need to confirm a corridor is clear before major works begin — reducing programme risk and avoiding costly rework.

Fast Turnaround

Mobilisation within days, not weeks. Reporting delivered promptly with 3D models processed and shared via secure link for immediate design team access.


Our Process

From schedule to deliverable.

01

Scope & Schedule

Client provides the SI schedule — service types to locate, corridor limits, and required depths. We review, clarify, and programme.

02

Mobilise & Excavate

Crew on site with plant, hand tools, and detection equipment. Trial pits dug to specification with all services positively identified.

03

Capture & Log

Photographic survey, GPS recording, and 3D point cloud scan of each excavation. Full trial pit form completed on site by the team leader.

04

Report & Deliver

Trial pit reports compiled with plans, sections, and photo records. 3D models processed and shared. Reinstatement completed to specification.